氹仔 TAIPA
澳門科技大學
MACAU UNIVERSITY OF SCIENCE & TECHNOLOGY
ONGOING
From 2007, Macau University of Science and Technology have since been our long-standing client.
Location:
Macau University of Science and Technology
Avenida de Wai Long, Taipa, Macau
Latest Project
Project Name:
Construction of Foundation Facilities for Ground Station of "Macao Science 1" Satellite
Past Projects Completed
Project Name:
Macau University of Science and Technology - The Construction of the Complex Academic Building of College of Humanities and Arts - Block "R"
The Construction of the Complex Academic Building of College of Humanities and Arts - Block "R" includes a 2-storey basement and 7-storey above the ground floor. The height of the building is 30.75M.
Site Area: 9,470 m2
Total GFA: ~ 29,850 m2
Project Name:
Construction of Complex Academic Building - Block "O"
The construction of M.U.S.T.'s academic building Block "O" includes a 2-storey basement and 9-storey above the ground floor. The ground level is + 5.40M, the finishing level is + 50.90M.
Site Area: 5,338 m2
Total GFA: ~ 29,495 m2
Project Name:
Phase V - Construction of Student Dormitory Block "P"
The student dormitory is 15-storey above the ground floor. The ground level is +5.50M, the finishing level is +60.5M.
Ming Shun is the main contractor of the project; the works include superstructure works, builder's works, fitting out and electrical and mechanical works.
Ground floor to 1/F is the carpark; and 2/F to 15/F is the student dormitory.
Site Area: 4,517 m2
Total GFA: 29,099 m2
Project Name:
Construction of M.U.S.T. Library Building
The library building is situated in a trapezoidal site area. The library is partially 5-storey high, and partially 3 to 4 storey high. There is no basement.
Our works include superstructure works, builder's works, fitting out, electrical and mechanical works.
Aside from housing a library, the building will also include reading rooms, discussion rooms, lecture halls, computer rooms and office space.Roof top gardens are located on the 3/F, 4/F and 5/F.
Site Area: 7,474 m2
Total GFA: 28,550 m2
Project Name:
Phase IV - Construction of Student Dormitory Block "M"
The student dormitory is 6-storey high, the G/F is 3.8m ceiling height and all other levels are 2.8m high. Ground floor to 5/F are dormitories only and provides 188 rooms.
Site Area: 2,907 m2
Total GFA: 11,179 m2