Project of "Empreitada de Construção de Edifício Público no Lote 6K na ZAPE" - Progress St

  • mingshunconstruction
  • 2019年5月7日
  • 讀畢需時 1 分鐘

According to the project schedule, it is necessary to carry out the piling work of the future building before dismantling the existing three-stories basement structure. A tailor-made steel platform has been installed to server the bored-pile and demolition works. Up to now, the overall progress of the bored-pile work is 10% and the existing basement will be dismantled when the bored-pile works is completed.

 
 
 