Project No. 121/2023 – "Design and Construction of Public Housing at Lot B5, Zone A New Urban Landfill Area"

2月14日
讀畢需時 2 分鐘

Project Status as of Feb 2026

Scope of Work:

The project is located on Lot B5 of Zone A New Urban Landfill Area, with a site area of approximately 9,682 square meters. It is planned as a comprehensive development comprising public housing, commercial spaces, an underground pedestrian street, underground passageways, public toilets, light rail station entrance/exit, a refuse compaction room and a public car park. The superstructure consists of three residential towers.The towers are slab-type buildings. Tower 1 and Tower 2 each have 27 floors above ground, while Tower 3 has 28 floors above ground. The development includes three basement levels and has a total gross floor area of approximately 112,253 square meters.

The project will provide a total of 1,003 residential units, including 344 T1 units, 586 T2 units and 73 T3 units. The design also includes 352 car parking spaces and 352 motorcycle parking spaces.

To the east of the site is the future underground entrance/exit of the light rail station, with the Central Green Corridor of Zone A running above. The southern boundary faces Tun Seng Avenue, the southwest adjoins Rotunda de Hou Kong, the west faces Avenida Doutor Ma Man Kei, and the north is bordered by a public green pedestrian zone.

All residential towers will be constructed using prefabricated building methods, incorporating elements include precast composite slabs, precast external walls, precast staircases, and ALC (autoclaved lightweight concrete) panels.


Current Project Progress:

As of February 2026, the project has completed Construction Milestone 3 (basement structure up to the ground floor structural slab) as scheduled in accordance with the approved construction progress and is currently focused on podium structure construction; According to the construction plan, the transfer floor structure is expected to be completed in May 2026, with topping out of the three tower structures targeted for the end of October 2026.

In parallel, to support the tower structure construction, production of related components such as precast elements and aluminum formwork is underway as planned, with delivery and installation scheduled to start in May 2026. Meanwhile, as architectural finishes and MEP (Mechanical, Electrical, and Plumbing) installation works are set to commence by the end of 2026, the construction mock-up has begun as scheduled, with the target of completion by the end of March 2026, followed by an inspection by representatives from the Housing Bureau in April to ensure on-site construction meets end-user requirements.


 
 
 

留言


RECENT POSTS

ARCHIVE POSTS

MING SHUN CONSTRUCTION AND PROPERTY INVESTMENT LIMITED.

Contact Us

TEL: (853) 28701611

FAX: (853) 28701622

​

​EMAIL: mingshun@macau.ctm.net

Luís Gonzaga Gomes Nº14

Edificio King Xiu Garden

Level 1, Andar B e C

​

Success! Message received.

© 2017 Ming Shun Construction and Property Investment Ltd.

bottom of page