Piling works for the project “Empreitada de Construção de Edifício Público no Lote 6K na ZAPE” was completed in the end of July 2019. At present, we are processing the demolition of existing three-storey basement structure and installation of the excavation and lateral support system (ELS). And targeted in the early October 2019, the construction of new pile cap foundation and structural ground beam will be started. Now the actual construction progress is 20% and tally with the master schedule.