“Construction of Public Housing at Avenida de Venceslau de Morais - Superstructure Work”

  • mingshunconstruction
  • 2022年10月19日
  • 讀畢需時 1 分鐘

Project Status as of August 2022


Scope of Work:

This project is one part of the public housing construction project under the Macao Public Works Bureau, and our Company is the general contractor of the project. After the project is completed, there will be a three-story basement parking lot and three residential towers. Tower I has a two-story podium with floors 3 to 32 as residential floors; Tower II has a three-story podium with floors 4 to 34 as residential floors; Tower III has a three-story podium with floors 4 to 23 as the residential floors. These 3 towers provide a total of 1,590 units, with 885 T1 type apartments and 705 T2 type apartments.


Current Progress:

The construction of the project started on December 30, 2021. At present, the structural construction of the podium and transfer floors of each building has been completed. The structure construction of the tower buildings is now in progress. The first tower is divided into two construction areas, and the second tower is divided into three construction areas, and Tower III is divided into two construction areas. The structure construction of towers I and II has reached the seventh floor, and that of tower III has reached the eighth floor. At present, the renovation work from the third floor of the basement to the ground floor is under construction, and the renovation work for each tower is expected to be gradually carried out in mid-September 2022.


Photos of the Project:


ree

ree

ree

ree

ree

ree

ree

ree

ree

ree

ree

ree

 
 
 

留言


RECENT POSTS

ARCHIVE POSTS

MING SHUN CONSTRUCTION AND PROPERTY INVESTMENT LIMITED.

TEL: (853) 28701611

FAX: (853) 28701622

​EMAIL: mingshun@macau.ctm.net

Luís Gonzaga Gomes Nº14

Edificio King Xiu Garden

Level 1, Andar B e C

Contact Us

Success! Message received.

© 2017 Ming Shun Construction and Property Investment Ltd.

bottom of page