“Construction of Public Housing at Avenida de Venceslau de Morais - Superstructure Work”

  • mingshunconstruction
  • 2023年8月9日
  • 讀畢需時 2 分鐘

Project No. 26/2021

Project Status as of July 2023


Scope of Work:

This project is one part of the public housing construction project under the Macao Public Works Bureau, and our Company is the general contractor of the project. After the project is completed, there will be a three-story basement parking lot and three residential towers. Tower I has a two-story podium with floors 3 to 32 as residential floors; Tower II has a three-story podium with floors 4 to 34 as residential floors; Tower III has a three-story podium with floors 4 to 23 as the residential floors. These 3 towers provide a total of 1,590 units, with 885 T1 type apartments and 705 T2 type apartments. T1 type 885, T2 type 705.


Current Progress:

Construction of the project commenced on 30 December 2021 and the structural capping was successfully completed on 18 April 2023. Completed 3 months ahead of contract node 1 (structural engineering leveling).

Interior renovation, exterior wall decoration (painting) and mechanical and electrical works are in full swing. About 80% of the muddy water works have been completed, and the interior decoration and dry work works are closely underway, including: painting, artificial stone, wooden doors, iron doors, iron gates, kitchen cabinets, aluminum window works... and so on work; The façade (paint) works have completed the pattern making and related technical guidance work and are now in the process of commencement immediately. The overall mechanical and electrical engineering has been completed by 40%, and the first stage of commissioning of each system is scheduled to be carried out in an orderly manner in March next year.

On the whole, the sub-works of this project are progressing in an orderly manner and the progress is normal.The project is expected to be completed on July 27, 2024.


Photos of the Project:

ree

Project panorama

ree

Panorama of Block T1

ree

Panorama of Block T2

ree

Panorama of Block T3


ree

The banner of topping off at the Block T3 flyover


ree

The banner of topping off at the location of Block T1 Majiao Shek


ree

Location on the ground floor of Block T2

ree

Location on the ground floor of Block T2

ree

Site photos of the basement

ree

Site photos of the basement

ree

Site photos of the basement

ree

Site photos of the basement

ree

Site photos of the basement

ree

Site photos of the basement

ree

Site photos of the basement

ree

Site photos of the basement

ree

Site photos of the basement

ree

Site photos of the basement

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)

ree

On-site photos of the model room (Floor 4F, Block T1)



































 
 
 

留言


RECENT POSTS

ARCHIVE POSTS

MING SHUN CONSTRUCTION AND PROPERTY INVESTMENT LIMITED.

TEL: (853) 28701611

FAX: (853) 28701622

​EMAIL: mingshun@macau.ctm.net

Luís Gonzaga Gomes Nº14

Edificio King Xiu Garden

Level 1, Andar B e C

Contact Us

Success! Message received.

© 2017 Ming Shun Construction and Property Investment Ltd.

bottom of page