“Construction of Public Housing in Lot B4 in Zone A of the New Urban Landfill Area ”
- mingshunconstruction
- 2022年11月15日
- 讀畢需時 2 分鐘
Project No. 39/2021
Project Status as of October 2022
Scope of Work:
This project is located in Lot B4 in Zone A of the new urban landfill area. It is planned to build a public housing building with 29 floors above ground and three underground floors. This project is the Superstructure work of the building. The lot area of this project is about 10,698 square meters, and the height of the building is 86.45 meters, with a total construction area of 153,088 square meters. The basement three floors will be a public parking lot, providing 498 car parking spaces and 532 motorcycle parking spaces. The ground floor to the second floor will be served as residential lobbies/shops/social facilities. And the third floor is a podium garden. From the 4th to 28th floors, it will be the residential floors, which provides 1575 apartments (including 400 T1 apartments, 525 T2 apartments, and 650 T3 apartments).
This project includes the main structure of reinforced concrete, the indoor and outdoor decoration, and various professional electromechanical installations etc.
The contract start date is March 7, 2022, and the completion date is: August 6, 2024; currently the project is mainly in the structural construction phase.
Current Progress:
Block I: The projects from ground floor to 7F of the tower building have been completed, and the structural works from 7F to 8F are in progress;
Block II: The projects from ground floor to 9F of the tower building have been completed, and the structural works from 9F to 10F are in progress;
Block III: The projects from ground floor to 9F of the tower building have been completed, and the structural works from 9F to 10F are in progress;
Block IV: The projects from ground floor to 9F of the tower building have been completed, and the structural works from 9F to 10F are in progress.