Construction of Public Housing in Lot B4 in Zone A of the New Urban Landfill Area – Superstructure W
- mingshunconstruction
- 2023年10月26日
- 讀畢需時 2 分鐘
Project No. 39/2021 Project Status as of October 2023
Scope of Work:
This project is located in Lot B4 in Zone A of the new urban landfill area. It is planned to build a public housing building with 29 floors above ground and three underground floors. This project is the Superstructure work of the building. The lot area of this project is about 10,698 square meters, and the height of the building is 86.45 meters, with a total construction area of 153,088 square meters. The basement three floors will be a public parking lot, providing 498 car parking spaces and 532 motorcycle parking spaces. The ground floor to the second floor will be served as residential lobbies/shops/social facilities. And the third floor is a podium garden. From the 4th to 28th floors, it will be the residential floors, which provides 1575 apartments (including 400 T1 apartments, 525 T2 apartments, and 650 T3 apartments).
This project includes the main structure of reinforced concrete, the indoor and outdoor decoration, and various professional electromechanical installations etc.
Current Progress:
The contract start date is March 7, 2022, and the project completion period is September 26, 2024; the main structure construction was completed in July 2023 (project node 1). Currently, indoor decoration, roof waterproofing, exterior wall finishes, The installation of mechanical and electrical equipment and elevator equipment has been smoothly carried out and fully invested in the construction.
At present, the progress of the muddy water and interior decoration work of the entire project is about 45%, and the progress of the mechanical and electrical equipment installation work is about 49%. The overall progress is normal, and fire acceptance is planned to be carried out in July next year.
Photos of the Project:































留言