Construction of Temporary Housing for Lot C (Zone C1) at Lot P Areia Preta-progress status
- 2021年11月18日
- 讀畢需時 1 分鐘
This project is one of the Construction of Temporary Housing at Lot P belonging to Macau Urban Renewal Limited, it plans to have a basement car park, 4 floors of podium and 4 blocks of residential tower buildings when the works are totally completed.
The project has officially started construction in mid-July 2021, and the inspection and testing works for the existing old piles on site have completed in mid-September 2021. At this stage, the works of new bored pile foundation and PHC tube-pile are under construction.








![Official Launch of [MING SHUN CONSTRUCTION AND PROPERTY INVESTMENT LIMITED. Office in Guangdong-Macau In-Depth Cooperation Zone in Hengqin]](https://static.wixstatic.com/media/2b0dab_57cd0e87eb944ac381689016ee2fc976~mv2.jpg/v1/fill/w_188,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/2b0dab_57cd0e87eb944ac381689016ee2fc976~mv2.webp)
![Official Launch of [MING SHUN CONSTRUCTION AND PROPERTY INVESTMENT LIMITED. Office in Guangdong-Macau In-Depth Cooperation Zone in Hengqin]](https://static.wixstatic.com/media/2b0dab_57cd0e87eb944ac381689016ee2fc976~mv2.jpg/v1/fill/w_66,h_88,fp_0.50_0.50,q_90,enc_avif,quality_auto/2b0dab_57cd0e87eb944ac381689016ee2fc976~mv2.webp)


















留言