“The Extension of Phase 1 of the Hospital Conde S. Januário – Public Health Specialty Building”
- mingshunconstruction
- 2023年5月18日
- 讀畢需時 1 分鐘
Project No. 34/2020
Project Status as of April 2023
Scope of Work:
The project is located to the southwest of the Hospital Conde S. Januário, between Estrada Nova and Estrada do Visconde de S. Januário. The lot area is 31698.16 square meters, with the total construction area of 30899.96 square meters, of which the parking area is 6098.03 square meters. The A2-level eight-storey building is 35.60 meters high (calculated from Estrada Nova, including the ground floor). The patient entrance and exit are located at the fifth floor, the staff entrance and exit are located at the sixth floor, and the logistics entrance and exit are located at the ground floor.
The building has four floors of isolation wards, each with 20 standard single isolation wards, with a total of 80 beds. To facilitate staff movement between the Specialty Building and the existing Hospital Conde S. Januário as well as the dormitory of the frontline medical staff, the pedestrian viaduct and underground passages are set up on the seventh and fifth floors of the Building to connect the two buildings.
Current Progress:
The project has been substantially completed and the fire inspection was completed on April 17, 2023.
At present, full efforts are being made to carry out the repair work and the acceptance process is carried out in an orderly manner. The mechanical and electrical systems have also been installed, and adjustment and testing work is underway.
The overall progress of the project is satisfactory, and it will be completed and delivered as soon as possible according to the contract completion period.