top of page
1st_news
RECENT POSTS






















Pontos de Partida e de Chegada da Quarta Ponte Macau-Taipa – Ligação da Av. Wai Long-progress status
The construction site is located at zone E of Macau New Urban Land, its main works includes the construction of the connecting flyover...


Concepção e Construção de Melhoramento de Emissario Residual da zona ZAPE e NAPE -Progress status
The 1st contractual milestone (Design proposal, Specification, structural and fabricating detail drawings of tunnel boring machine, ELS...


Construction of Temporary Housing for Lot C (Zone C1) at Lot P Areia Preta-progress status
This project is one of the Construction of Temporary Housing at Lot P belonging to Macau Urban Renewal Limited, it plans to have a...


Groundbreaking Ceremony for project of Lot C (C1) temporary housing at Lot P areia pretA (2/8/2021)
A Joint Groundbreaking and Worship ceremony for the Construction of Temporary Housing for Lot B, C1 and C2 at the Lot P in Areia Preta...


Groundbreaking and worship Ceremony for the 4th bridge - connection line AV. Wai long (03/06/2021)
「Ming Shun」 held a Groundbreaking and Worship ceremony of "Empreitada de construção da rede viária na periferia dos pontos de partida e...
2nd_news
3rd_news
ARCHIVE POSTS
bottom of page